On-Site Projects
Foundation - ICCAL
Employer: Arquitectura y Espacios Proyectos de Ingeniería S.A.S.
Client: Fundación Santa Fé de Bogotá.
Duration: 07/2022 - 12/2022
Foundation work for a 6-story hospital building with 1 basement, including oversight of the concrete casting of a solid beam (over 0.80 meters in both width and depth) to ensure compliance with American Concrete Institute regulations for massive elements (ACI-207). To ensure proper setting of the concrete without cracks, 5 real-time temperature sensors were placed at specific points, and sun-ray reflective additive layers were applied, along with specialized techniques to maintain delta temperatures below 19°C
Surgery rooms
Employer: Arquitectura y Espacios Proyectos de Ingeniería S.A.S.
Client: Fundación Santa Fé de Bogotá.
Duration: 09/2021 - 07/2022
Renovation of 1,250 m² divided into 5 stages in a modern medical building, including the construction of new post-anesthesia care units and 4 advanced surgical rooms, equipped with the following systems: gas, electrical (normal and regulated), voice and data, HVAC, hot and cold water, sanitary, and ventilation.
Welcome Rooms
Employer: Arquitectura y Espacios Proyectos de Ingeniería S.A.S.
Client: Fundación Santa Fé de Bogotá.
Duration: 03/2021 - 09/2021
Renovation of the welcome rooms in a cutting-edge technological hospital, including modifications to lighting systems, networks, flooring, roofing, and furniture.
COVID-19 Prison Renovations
Employer: Consorcio Eron 2020
Client: Unidad de Servicios Penitenciarios y Carcelarios.
Duration: 08/2020 - 03/2021
Provided technical supervision during the emergency response and maintenance for COVID-19 at the three largest prisons in Bogotá D.C., covering a total area of 6,400 m². The work included concrete foundations for security cells, groundworks, general maintenance of finishes, networks, and repairs to metal structures and roofs
Bicentenario Road
Employer: Gerencia Mas Proyectos S.A.S.
Client: Constructora Bolivar S.A.
Duration: 06/2019 - 03/2020
Worked as a construction site supervisor for the construction of a 170x18 meter road in Zipaquirá, Cundinamarca. The project involved groundworks, pavement installation, a bicycle lane, public utility systems—including the town's main sanitary pipe (1.30m diameter), and structural elements like drainage filters.
Road and Public Utilities Adaptation
Employer: Desarrollo Urbano Constructores S.A.S.
Client: Emserchia.
Duration: 02/2019 - 06/2019
Site engineer in the adaptation of 161 meters of road along with its old sewer networks located 4 meters deep from ground level.
Urban Infrastructure Adaptation
Employer: Desarrollo Urbano Constructores S.A.S.
Client: Grupo Ortiz.
Duration: 05/2018 - 02/2019
Coordinated and supervised as Site Engineer the adaptation of the town's main road urban infrastructure, including groundworks, roadway and sidewalk construction, and the installation of public utility networks. Additionally, oversaw the construction of two energy dissipators with deflector screens, totaling 45 meters in length, in steep and hard-to-access terrain.